Nova Dynamics Limited
 Consulting Engineers
   
 
Navigation
 
  Home
  Services/Specialization
  Our Staff
  Our Location
  Past Projects
  Contact Information
  Photos
  Important Links
  Careers/Recruitment
Photographs of past projects
 
Below are digital images with comments of work that NDL has participated in.
 
Electrical and instrumentation design and fabrication supervision for a diesel fuel filter skid for the Sable offshore oil platform for Mulgrave Machine Works.
(Click link to view large image: 361 KB)
Loading arms offloading oil form supertanker at Statia terminals Point Tupper. NDL provided PLC controlled electro-hydraulic controls to operate and monitor loading arms for both loading piers.
(Click link to view large image: 100 KB)
Package boiler installation for oil tank cleaning at Statia Terminals.
(Click link to view large image: 342 KB)
Control panel on portable process equipment used in hazardous area oil tank farm Statia Terminals.
(Click link to view large image: 257 KB)
NDL has provided electrical power controls and instrumentation design and maintenance services for several municipal water and wastewater sites. Typical upgrade of existing plants Stellarton Water treatment plant.
(Click link to view large image: 329 KB)
DCS Operator interface for industrial boiler upgrade at Stora Enso.
(Click link to view large image: 42 KB)
Industrial water demineralization plant for boiler feed water at Stora Enso plant. NDL provided electrical, instrumentation and piping design to interconnect the process skids.
(Click link to view large image: 65 KB)
Industrial water demineralization plant for boiler feed water at Stora Enso plant. NDL provided electrical, instrumentation and piping design to interconnect the process skids.
(Click link to view large image: 61 KB)
New warehouse automated vertical storage module at Stora Enso.
(Click link to view large image: 26 KB)
Stora Enso stores warehouse building, total 55,000 square feet. NDL completed the electrical and communications design.
(Click link to view large image: 172 KB)
Typical PLC I/O cabinet designed installed and commissioned for industrial client paper machine controls.  This installation is at a Stora Enso plant.
(Click link to view large image: 335 KB)
NDL provided electrical power and lighting system design for 55,00 square foot industrial warehouse. Stora Enso Stores warehouse building.
(Click link to view large image: 253 KB)
Stora Ensos Paper Machine #2, NDL provided electrical and instrumentation design for upgrades to this machine.
(Click link to view large image: 44 KB)
Vertical boring mill with 50 ton work piece - DC drive application at Trenton Works.
(Click link to view large image: 301 KB)
Vertical boring mill with 50 ton work piece - DC drive application at Trenton Works.
(Click link to view large image: 313 KB)
Typical installation of chemical feed pumps with variable speed motors in industrial environment.
(Click link to view large image: 407 KB)
 
 

 
 
 
 
 
 
 
 
 
 

 Site designed by Lucas Technology.
 Best viewed in Internet Explorer 5.5 or better at a screen resolution at 1024 x 768 or better.